Year:2012
Project range:drawing design,construction
Scale:total length 120m
The pontoon bridge has been completed within 12 days from design to construction,which has set a new record in the industry.The bridge is mainly made of steel structure,anti-corrosion board and PE plastic float box,the design load is 300 kg/m²,can withstand maximum fall 2m.
